Paver base calculator for Vermont
The hidden layer that keeps a patio level after five years, calculated by compacted depth and tons.
Enter your project dimensions
The pavers are only the finish surface, while the stone underneath does the supporting. When a patio settles or shifts, the trouble usually began below it. This calculator estimates compacted crusher run or a comparable blend at 1.5 tons per cubic yard. Plan 4 inches for walking areas and 6-8 for vehicles, with the +10% compaction allowance already selected. Calculate bedding sand separately as a strict 1-inch layer.
Calculating base material
- Find the paved area in feet and extend the base 6 inches beyond each exposed paver side. This extra base supports the edge restraint.
- Use 4 inches of compacted base for patios and walkways, 6 for driveways or clay soil, and 8 beneath driveways on soft ground.
- Divide cubic feet by 27 for yards, multiply by 1.5 for tons, then add the +10% allowance.
Excavation depth = base + 1" bedding + paver thickness − reveal
Project base depths and coverage
| Project | Compacted base depth | 1 ton covers |
|---|---|---|
| Walkway or garden path | 4 inches | ≈ 54 sq ft |
| Patio or seating area | 4-6 inches | ≈ 43 sq ft |
| Driveway with cars | 6-8 inches | ≈ 31 sq ft |
| Clay or soft subgrade | add 2 inches + fabric | n/a |
Excavation layers from lawn to finished pavers
Add the layer depths together to determine how far to excavate. For a typical patio, allow 4 inches of base, 1 inch of bedding sand, and a 2 3/8 inch paver set flush to the lawn. That comes to a 7.5-inch dig, adjusted for the reveal you want above grade. Put the target depth on a stake and refer to it while digging. Digging too deep costs twice: extra soil must be hauled away, and more stone is needed to restore the grade. Use the Dirt Calculator in reverse to find how many yards come out of the excavation.
Installer practices for lasting paver bases
- Build the base in 2-inch layers, lightly misting and plate-compacting every layer. A damp aggregate base compacts more firmly than a dry one.
- Before adding sand, finish the base with a 2-3% pitch away from the house. Pavers and sand will follow its grade.
- The 6-inch base extension supports the edge restraint, so place it on compacted aggregate instead of lawn soil.
- In Champlain Valley clay, put woven geotextile down first and build the base over it. This keeps stone from sinking into the subgrade during wet seasons.
- Base depth cannot be replaced with a deeper bed of sand. Sand shifts, which is how patios end up uneven.
Re-laying old pavers: checking the base
When resetting an existing patio, the base may still be usable. Remove the pavers, rake away the old bedding sand, then check the base. If it remains level, firm, and drains well, add a new 1-inch bedding layer, reducing the stone order to a tenth of what a new installation needs. If there are low areas, soft spots, or standing water, remove and rebuild the base as well. Leaving those problems in place leads to the same failure beneath the replacement pavers.
Example: a 16 x 12 patio
For a 192 square foot paved area, adding the 6-inch extension along three exposed sides brings the base footprint to 210. With a 4 inches compacted depth: 210 x 0.333 = 70 cubic feet = 2.6 cubic yards, or about 3.9 tons and 4.3 with the allowance. Order 4.5 tons of crusher run plus 0.9 tons of bedding sand from the Paver Sand Calculator in one free delivery. Arrange the drop after excavation, since a stone pile left on grass for two weeks can create a dead rectangle.
Questions about depth, excavation and tonnage
How can I calculate the paver base I need?
Will 2 inches of paver base work?
What depth of base is needed for pavers?
How far should I dig down for pavers?
For paver base, crusher run or screenings?
Can pavers go down without a base?
More calculators
A solid base supports the finished pavers.
Order crusher run and screenings by the ton with bedding sand, with free delivery.